• Redjard@reddthat.com
    link
    fedilink
    English
    arrow-up
    4
    ·
    14 days ago

    A well-known metallurgical behavior was found at the surface of the module, which will be fixed by the end of the third quarter of 2026.

    Holy shit. This is “chatgpt rewrite this less negatively without mentioning rust” levels of corporate speech.