FAQ
- When next launch? (Flight 13) Unknown, likely NET July.
- When previous launch? (Flight 12) Starship flight 12 launched on 2026-05-22 at 22:30:24 UTC.
- What was the result? Successful liftoff. Booster boostback burn is incomplete, and landing burn fails. Ship experiences an R-vac out shortly after stage separation, but limps to orbit on 5/6 engines. In-space raptor relight is cancelled, but payload deployment is nominal. Ship reentry, landing burn, and splashdown are nominal.
Previous Flights
Click to expand
- Flight 1: S24 and B7. First full stack launch, RUD before stage separation.
- Flight 2: S25 and B9. Successful stage separation, booster RUD during boostback burn, ship RUD shortly prior to scheduled SECO.
- Flight 3: S28 and B10. Booster performs a successful boostback burn, but experiences RUD during landing burn. Ship makes it past SECO, but loses attitude control and is destroyed on reentry.
- Flight 4: S29 and B11. First successful booster water landing. Ship survives reentry despite burn-through on forward flap, and performs a successful water landing.
- Flight 5: S30 and B12. First booster catch with chopsticks. Ship performs successful water landing.
- Flight 6: S31 and B13. Booster offshore divert due to damage to catch tower during launch. Ship performs successful water landing.
- Flight 7: S33 and B14-1. First V2 Ship launch. Harmonic oscillation on ship causes RUD before SECO. Booster is caught by chopsticks.
- Flight 8: S34 and B15-1. Engine failure on ship causes RUD before SECO. Booster is caught by chopsticks.
- Flight 9: S35 and B14-2. First booster reflight. Ship makes it past SECO, but loses attitude control and is destroyed on reentry. Booster RUD upon landing burn startup prior to planned splashdown.
- Flight 10: S37 and B16. All mission objectives fulfilled. First V2 ship to make it through reentry to landing burn and splashdown. First successful deployment of Starlink simulators. Booster successfully tested landing without one centre engine, using an engine on the middle ring to compensate.
- Flight 11: S38 and B15-2. All mission objectives fulfilled. Ship performs successful landing burn and splashdown, despite intentional missing tiles on heatshield. Second successful deployment of Starlink simulators. Booster successfully tested a 13-5-3 engine landing profile.
- Flight 12: First V3 launch. Successful liftoff. Booster boostback burn is incomplete, and landing burn fails. Ship experiences an R-vac out shortly after stage separation, but limps to orbit on 5/6 engines. In-space raptor relight is cancelled, but payload deployment is nominal. Ship reentry, landing burn, and splashdown are nominal.
Quick Links
Nerdle Cam | Lab Cam | Sapphire Cam | Sentinel Cam | Rover Cam | Rover 2.0 Cam | Rocket Ranch Cam | Plex Cam | NSF Starbase Live | afarTV Florida Gigabay Live
Starship Dev June | Starship Dev May | Flight 12 | Starship Dev April | Starship Dev March | Starship Dev February
2026-04-27 SpaceX Starship Update Video
Road closures, road delays, and beach closures
Vehicle Status
*As of 2026-07-01
| Ship | Location | Status | Comments |
|---|---|---|---|
| S39 (Ship v3 SN1) | Indian Ocean | Destroyed | Stacking took place from Aug 16th through Nov 15th. Aft flaps installed Jan 19th and 20th. Cryo tested at Massey’s Feb 26th through Mar 8th. Static fired on Apr 14th. Stacked on B19 May 9th. Wet dress rehearsal May 11th. Cryo tested at Massey’s May 16th. Partial WDR May 20th. Launched May 22nd. |
| S39.1 (test tank) | Massey’s | Testing | |
| S40 | Massey’s | Static fire testing | Stacking took place from Nov 12th through March 2nd. Cryo testing from May 3rd through May 6th. Engine testing Jun 24th through 26th. |
| S41 | Megabay 2 | Pending engine install | April 17th: Pez Dispenser moved into MB2. April 20th: Nosecone+Payload Bay stack N:3 moved into MB2 and later that day lifted over the Pez Dispenser. Later that day the Pez Dispenser was installed. April 21st: Forward Dome section FX:4 moved into MB2. April 28th: Common Dome Section CX:3 moved into MB2. May 2nd: Section A2:3 moved into MB2. Cryo testing Jun 28th to present. |
| S42 to S46 | Starfactory | Nosecones under construction plus tiling | January 19th: Photos of nosecones inside the Starfactory (note that S44 isn’t visible because it’s been moved elsewhere). January 28th: Latest photos of the nosecones |
| Booster | Location | Status | Comment |
|---|---|---|---|
| B18.1 | Massey’s | Testing | |
| B18.3 | Massey’s | Testing | |
| B19 | Gulf of Mexico | Destroyed | Stacking took place from Nov 25th through Dec 23rd. Cryo tested Feb 1st through Feb 9th. 10-engine static fire Mar 16th, 33-engine static fire Apr 15th. Wet dress rehearsal Apr 16th. 33-engine static fire May 7th. Wet dress rehearsal May 11th. Partial WDR May 20th. Launched May 22nd. |
| B20 | Megabay 1 | Pending static fire | Stacking took place from Feb 5th through Apr 30th. Cryo tested Jun 6th through Jun 8th. |
| B21 | Megabay 1 | Stacking | Stacking began Jun 4th, completed Jun 28th. |
| B22 | Megabay 1 | Stacking | After B18’s failure, Mark Federschmidt (one of the members of the Starship booster team) made some tweets which mentioned B19 to B22 being under construction (meaning sections inside the Starfactory). Stacking started Jun 29th. |
Resources
- LabPadre Channel | NASASpaceFlight.com Channel
- NSF: Boca Chica Production Updates Thread
- NSF: Elon Starship tweet compilation
- SpaceX: Website Starship page | Starship Users Guide (2020, PDF)
- FAA: SpaceX Starship Project at the Boca Chica Launch Site
- FAA: Temporary Flight Restrictions NOTAM list
- NASA: Starship Reentry Observation (Technical Report)
- Hwy 4 & Boca Chica Beach Closures (May not be available outside US)
- Production Progress Infographics by @RingWatchers
- Raptor Tracker by @SpaceRhin0
- Acronym definitions by Decronym
- Tim Dodd: Starbase Tour with Elon Musk, Part 1 | Part 2 | Part 3
- Tim Dodd: 2022 Elon Musk Interviews, Starbase/Ship Updates | Launch Tower | Merlin Engine | Raptor Engine
- Tim Dodd 2024 Elon Musk Interviews: Starfactory tour | Pad tour and post-IFT-4 interview
- Tim Dodd 2025 pre-Flight-9 Elon interview
You must log in or # to comment.
2026-07-30:
- Massey’s: Road delay for “Production to Masseys” is posted for Jul 30th 23:59 to Jul 31st 04:00. (starbase.texas.gov, archive, ViX)
- A new frame is lifted into the “supercrusher” structure. (ViX)
- A cardinal is observed. (RGV Aerial)
- Production site: B22’s aft dome (section AX:2) enters Megabay 1. (ViX, Blobifie)
- Gigabay construction continues. (mymatrixplug)
- Photos of S43.1 in Megabay 2. Nosecone is stacked on forward section. (StarshipGazer, mymatrixplug)
- Launch site: Boom sections and counterweights are delivered for the SpaceX-owned LR11000 crane. (ViX)
- Another section for the Pad 1 launch mount is delivered. (StarshipGazer)
- Construction of the Pad 1 flame trench walls continue. (Killip)
- The Pad 2 flame trench is being reinforced with additional steel plates. (Killip)
- Flight 13: Photo of S40 taken from a Starlink V3 satellite, and confirmation that the satellites fired their ion engines. (Starlink)
- GO AUSTRALIS still holding position near S40, NORMAND RANGER (490 km away) and SKIMMER TIDE (700 km away) still en route. (mcrs987 1, mcrs987 2, mcrs987 3, Blobifie)
- Flight 14 NET Aug 20th, per compass.atfm.aero, slide 34. (pptx warning)
2026-07-29:
- Pad 2: The torsion bar is removed from the left chopstick and lowered to the ground. (ViX)
- A new torsion bar is installed. (ViX)
- Pad 1: Steel for the base of the tower is delivered. (ViX)
- Production site: B22’s LOX landing tank enters Megabay 1. (ViX, Testflight)
- Test article S43.1 has been transferred to a transport stand. (ViX 1, ViX 2, RGV Aerial)
- S42 is moved from the turntable to the centre work stand. (ViX)
- An autonomous lawnmower is observed outside Starfactory. (Avid Space)
- A corner segment for the Pad 1 launch mount is observed at Sanchez. (Gisler, Anderson)
- McGregor: R3.194 left the testing area R3.130 arrived. This was the first sighting of R3.130 since it was removed from B20. (SpaceRhin0)
- R3.130 leaves the testing area. (SpaceRhin0)
- Flight 13: “The ship landing was precise, meaning that it would have been caught by the tower arms” (Elon)
- Landing burn buoy video. (Starlink)
- SKIMMER TIDE and NORMAND RANGER are both en route to the location of S40 and GO AUSTRALIS. (interstellargw, Killip, mcrs987 1, mcrs987 2, mcrs987 3, mcrs987 4)
- Florida: LC-39A chopsticks rise to the top of the tower. (wvmattz)
2026-07-28:
- Production site: The new nosecone test article (“S43.1 QUAL”) in Megabay 2 is moved from the right side to the centre stand, then back to the right side. (ViX)
- The Pez-dispenser-like stand enters Megabay 2, the mystery trapezoidal stand is lifted onto it, and the nosecone section is lifted over both. (ViX)
- The entire assembly is then moved to the right side. (ViX)
- Diagram of the assembly. (Killip)
- Gigabay construction continues. (RGV Aerial)
- Pad 1: Launch mount legs two of four arrive. (ViX)
- Scrapping of the ship quick disconnect arm is completed. (ViX, Blobifie)
- Pad 2: Chopstick landing rails are raised, three extension-retraction tests of the booster hold-down clamps are performed, and the chopstick rails are lowered. (ViX)
- McGregor: R3.194 moves towards the testing area. (SpaceRhin0)
- Flight 13: Landing burn and splashdown video. (SpaceX)
- S40 is still afloat. The Starship Recovery team continues to take pictures. (SpaceX, Elon, TurkeyBeaver, mcrs987 1, mcrs987 2, mcrs987 3)
- “We’re sending a ship out to recover Starship” (Elon)
2026-07-27:
- Production site: 3rd R-vac for S41 enters Megabay 2. (ViX, SpaceRhin0, Blobifie)
- Mystery trapezoidal frame is lifted across to the left side of Megabay 2. (ViX 1, ViX 2)
- A potential test article (ship nose cone) enters Megabay 2 and is lifted to the right side the bay. (ViX, lewisknaggs42, Blobifie)
- Past month’s Gigabay construction timelapse. Framework of final level is nearly complete. (Priel)
- Pad 1: Ship quick disconnect arm is removed from the tower, part of the arm is cut off. Components for a new quick disconnect arm are already at Sanchez (ViX 1, ViX 2, Gisler, Blobifie 1, Blobifie 2, Killip)
- More flame trench wall sections are delivered. (ViX)
- Flight 13: More photos. (SpaceX)
- FAA confirms no mishap investigation required. (NSF)
- S40 is still afloat. (mcrs987 1, mcrs987 2, )
- Umbra satellite image of S40 and Go Australis. (Stranger 1, Stranger 2)
- McGregor: Past week’s Raptor tracking summary. (SpaceRhin0)
- R3.113 is moved towards the testing area. (SpaceRhin0)
- Artemis IV: Leaked video of S22 HLS mockup interior. (Video, mcrs987)
2026-07-25:
- Jul 24th addendum: Post-launch chopsticks testing. (ViX)
- Flight 13: Additional photos and video of launch. (SpaceX 1, SpaceX 2, SpaceX 3, SpaceX 4, AJamesMcCarthy, dwisecinema)
- “This flight intentionally had much higher acceleration to test how well the heat shield tiles would remain attached at high dynamic pressure. Test was successful.” (Elon)
- S40 is still afloat. Support ship Go Australis is staying nearby. (Blobifie 1, Blobifie, mcrs987 1, mcrs987 2, mcrs987 3, mcrs987 4, mcrs987 5, mcrs987 6, mcrs987 7)
- Production site: B22’s methane transfer tube moves from Starfactory to Megabay 1. (ViX, Blobifie 2, Blobifie 2)
- One of S42’s raceways is positioned on the centre work stand. (ViX)
- S42’s aft flaps are staged for installation. (ViX, Blobifie)
- Massey’s: Road delay for “Masseys to Production” is posted for Jul 25th 23:59 to Jul 26th 04:00. (starbase.texas.gov, archive)
- Florida: SLC-37A tower module 9 of 9 is stacked. (NSF, Bergeron)
2026-07-24:
- McGregor: Overnight, a Raptor 3 is moved towards the testing area. (SpaceRhin0)
- R3.120 is moved towards the testing area. (SpaceRhin0)
- Production site: Transfer tubes have been installed in S42. Transfer tube jig returns to Starfactory, and S42’s final aft barrel section enters Megabay 2. Two R-vacs also enter Megabay 2, presumably for S41. (ViX, SpaceRhin0, Blobifie) Launch site: Overnight, the ship and booster transport stands are moved back to Sanchez. (ViX)
- 12:41: Range support helicopters are on duty. (ViX)
- 13:42: Chopsticks release the ship and move to launch position. Movement of stabiliser arms and catch rails are observed. (ViX)
- 14:50: Pad is cleared. (ViX 1, ViX 2)
- 15:45: Tank farm is active. (ViX)
- 17:14: Go for propellant load. (SpaceX, NSF)
- 16:51: Brief hold in the count, released a few minutes later. (ViX 1, ViX 2)
- 17:06: Tower venting. (ViX 1, ViX 2)
- 17:18: Booster propellant loading begins. (ViX)
- Last week’s abort was due to “off-nominal spin response in the ox turbopumps on six of the engines”, likely due to “moisture inside of the pumps from previous operations, which froze when new cryogenic propellant was introduced”. Wednesday’s test was a test of all 33 ox pumps at cryogenic temperatures. (SpaceX)
- 17:51: Flight 13 happens.
- Post-launch chopsticks movements. (ViX)
Flight 13:
- Nominal liftoff. (SpaceX, NSF 1, NSF 2, Liedtke, Evans, Menon)
- Nominal MECO, ignition of ship engines, and booster flip. (SpaceX 1, SpaceX 2, NSF, Golden)
- Boostback burn ended early. (TrackingTheSB / SpaceX, mcrs987)
- Incomplete engine startup booster landing burn. (SpaceX, NSF)
- Ship SECO and nominal (sub-)orbit insertion. (SpaceX 1, SpaceX 2)
- Nominal deployment of 20 Starlink v3 satellites. (SpaceX, NSF 1, NSF 2)
- Nominal raptor relight test, visible from South Africa. (SpaceX, NSF, craignattrass, SawyerMerritt, OliverPick3, orlando_mi77506)
- Acquisition of signal from all deployed satellites and communication over both radio and laser frequencies. (SpaceX, michaelnicollsx)
- Ship reentry. (SpaceX)
- Ship banking manoeuvre. (SpaceX)
- Ship landing burn and splashdown. For the first time, the ship remains intact after tipping. (SpaceX, NSF 1, NSF 2, ViX, Elon, Golden)
- “We got all the heat shield data we needed and then some!” (Elon)
- Flight 14: “Unless we discover problems after mission data review, SpaceX will attempt to catch the ship with the tower on next flight” (Manley, Elon)
My favorite status is “Stacking”, makes me so happy. Duplo/“Lincoln Logs”-based childhood influence.
Cheers for posting all this.
Thanks! Glad to know my efforts are appreciated :)
2026-07-10:
- Jul 10th addendum: The Pad 2 booster quick disconnects attached to B20, booster venting was observed, the transport stand was staged near the D1 gate, the Chopsticks released the booster and were raised to the top of the tower, and the ship quick disconnect arm swung in.
- Pad 2: B20 testing. (NSF full livestream)
- Tank farm is active. (J_A_Rees_94)
- Booster transport stand retreats. (NSF)
- Road is closed. (TrackingTheSB)
- Propellant load begins. (TrackingTheSB, NSF, J_A_Rees_94)
- B20 performs a ~24-second static fire. (NSF, Avid Space, ViX 1, ViX 2, ViX 3, ViX 4, ENNEPS, TrackingTheSB, Elon / NSF, RGV Aerial, Cphillips_03, interstellargw, BoosterTribe, J_A_Rees_94, SpaceX)
- Pressure data 6 miles (10 km) from the pad. (Avid Space)
- Road opens, the booster transport stand returns to the Pad, the ship quick disconnect arm swings out, the chopsticks are lowered around B20, and chopstick landing rail tests are performed. (ViX)
- Chopsticks return to the top of the tower and perform more tests. (ViX, ViX 2)
- Road delay for “Pad to Production” is posted for Jul 11th 02:00 to 08:00. (starbase.texas.gov, archive, ViX)
- Flight 13: Landing area. (www.sealagom.com)
- Other: 34-minute documentary on the issues leading up to Flight 12. (SpaceX)
2026-07-05:
- Jul 4th addendum: Fireworks. (ViX 1, ViX 2, StarbaseTX, colleenadastra, Gisler)
- White tiles were observed on a nosecone in Starfactory. Usage of pins instead of RTV silicone adhesive is noted. (cnunez, Killip)
- Massey’s: Road delay for “Masseys to Production” is posted for Jul 5th 23:59 to Jul 6th 04:00. (starbase.texas.gov, archive, ViX)
- S41’s aft and forward flaps are retracted. (ViX 1, ViX 2)
2026-07-08:
- Jul 7th addenda: Pad 2 chopsticks testing. Flexing of the tower is noted. (ViX, DeffGeff)
- Testing of the Pad 2 launch mount clamp arms and booster quick disconnects.
- Launch site: The third basement section for the Pad 1 ground support equipment bunker is lifted into position, and the main body of the SpaceX-owned LR11000 crane is moved behind Tower 1. (ViX)
- Beach closures are posted for Jul 9th 01:00 to 23:00 and Jul 10th 07:00 to 19:00. (starbase.texas.gov, archive, ViX)
- Road delay for “Production to Pad” is posted for Jul 9th 01:00 to 05:00. (starbase.texas.gov, archive, ViX)
- Build site: Pad 1 flame bucket and launch mount hardware tracking diagram. (Killip)
- The booster transport stand arrives. (TrackingTheSB)
- Flight 13: Notices to mariners and airmen indicate that launch is NET Jul 15th. (ViX, wvmattz, lewisknaggs42)
- Florida: SLC-37 tower module 5 of 9 is stacked. (Bergeron)
2026-07-09:
- Build site: Booster transport stand enters Megabay 1. (ViX)
- Megabay 1 door opens, B20 is disconnected from overhead crane. (TrackingTheSB 1, TrackingTheSB 2)
- B20 emerges from Megabay 1. (ViX, StarshipGazer, TrackingTheSB)
- B22’s A5:4 section moves from Starfactory to Megabay 1. (ViX)
- B22’s A5:4 section is stacked. (ViX, StarshipGazer, J_A_Rees_94, TrackingTheSB)
- Massey’s: Road delay for “Production to Masseys” is posted for Jul 10th 23:59 to July 11th 04:00. (starbase.texas.gov, archive, ViX)
- Launch site: The LR11000 crane is lowered. (ViX)
- Booster rollout is delayed, beach closures are updated. (ViX 1, ViX 2)
- B20 moves from Megabay 1 to Pad 2. (NSF 2, NSF 2, Avid Space, ViX, ViX, StarshipGazer, SpaceX, colleenadastra, TrackingTheSB 1, TrackingTheSB 2, Gisler, Gomez 1, Gomez 2, cnunez, NSF full livestream)
- R3.165 is observed on B20. (ViX)
- B20 is lifted onto the Pad 2 launch mount. (Avid Space, ViX 1, ViX 2, StarshipGazer, TrackingTheSB 1, TrackingTheSB 2, colleenadastra, wvmattz, Golden)
- It appears that the wiring harnesses around the base of the booster can be removed while the booster is at the launch site. (RyanHansenSpace)
- Florida: VP of Launch Kiko Dontchev shares a recent photo from inside the Gigabay. (TurkeyBeaver)
- Render of booster breakover hardware. (Killip)
- A launch mount segment is staged at Roberts Road pending rollout to SLC-37A. (Bergeron)
2026-07-22:
- Pad 2: Overnight, B20 rolls out to Pad 2 and is placed on the launch mount. (NSF, ViX, TrackingTheSB 1, TrackingTheSB 2, Evans, colleenadastra, Pike, Gisler 1, Gisler 2, Zhang 1, Zhang 2)
- B20 testing. (NSF full livestream)
- Road is closed. (ViX 1, ViX 2, TrackingTheSB)
- Frost on LOX tank. (TrackingTheSB, NSF, Pike)
- Frost on methane tank. (TrackingTheSB)
- Full LOX load, small methane load, possible spin prime, possibly not. (NSF, ViX, Golden)
- Depress vent. (TrackingTheSB)
- Timelapses. (NSF, Pike, Priel)
- “Additional preflight testing on Super Heavy complete.” (SpaceX)
- Cryo deliveries. (ViX)
- S40 rolls out to Pad 2. (NSF, ViX 1, ViX 2, colleenadastra 1, colleenadastra 2, Evans, Zhang)
- S40 is stacked on B20. (StarshipGazer, NSF, CeaserG33, wvmattz, RGV Aerial, cnunez 1, cnunez 2, cnunez 3, colleenadastra)
- Production site: Tile installation on S42 has begun. (Blobifie)
- B22’s methane header tank and its A6:4 section enter Megabay 1. (Blobifie)
- Massey’s: B21 rolls back to the production site. (NSF, ViX, colleenadastra)
- Flight 13: Beach closures are posted for Jul 23rd and 24th, both 12:00 to 21:00. (starbase.texas.gov, archive)
- McGregor: Addendum from previous day. R3.169 is delivered to the testing area, and R3.131 (removed from B20 E6 position) leaves the testing area. (SpaceRhin0)
- R3.131 is moved towards the hangar. (SpaceRhin0)
- R3.179 heads towards the testing area. (SpaceRhin0)
- Florida: At SLC-37, the load spreader is being attached to the LR13000 crane in preparation for the lifting tower module 9 of 9. (Bergeron)
2026-07-21:
- Miscellaneous flyover photos are posted. (CeaserG33)
- Massey’s: Overnight, B21 completes its 3rd cryo test. (ViX)
- Road closure for “Masseys to Production” is posted for Jul 22nd 10:00 to 14:00. (starbase.texas.gov, archive, ViX)
- B21 performs its 4th cryo test. (ViX)
- Production site: S40 is transferred to the transport stand and exits Megabay 2. Decals have been applied to the ship. (ViX, colleenadastra, davidjdphotos)
- The four-point lifting jig enters Megabay 2. S42’s methane transfer tubes move from Starfactory to Megabay 2. (ViX)
- B20 exits Megabay 1. (Avid Space)
- Launch site: Road closure for “Production to Pad” is posted for July 21nd 22:00 to 02:00. (ViX)
- Road closure for “Production to Pad” is posted for July 22nd 12:30 to 16:30. (starbase.texas.gov, archive, ViX)
- Parts of the SpaceX-owned LR11000 crane are returning to the site after refurbishment. (ViX)
- The rented LR11000 crane is laid down, and the crane at the air separation site is being disassembled and shipped out. (ViX)
- The Pad 2 chopsticks move into “booster receive” position. (ViX)
- The Pad 2 ship quick disconnect performs extension and retraction tests. (ViX)
- B20 moves from Megabay 1 to Pad 2. (ViX, wvmattz 1, NSF 1, wvmattz 2, NSF 2, Evans, Pike 1, Zhang, Pike 2, Gomez)
- Flight 13: Beach closures are scheduled for Jul 22nd 09:00 to 23:00 and Jul 23rd 07:00 to 09:00. (starbase.texas.gov, archive, ViX)
- Temporary flight restriction is posted for Jul 23rd from 22:30 UTC to 00:54 UTC the following day. (interstellargw)
- McGregor: Overnight, another Raptor 3 is observed, leaving the testing area. (SpaceRhin0)
- R3.199 leaves the testing area. (SpaceRhin0)
- R3.78 (problematic E13 engine from B20’s first launch attempt) leaves the testing area. (SpaceRhin0)
2026-07-23:
- Jul 22nd addenda: Timelapse of S40 stacking on B20. (ViX)
- Timelapse of cryo deliveries. (ViX)
- Massey’s: Overnight, the LOX landing test tank performs its 3rd cryo test. (ViX)
- The B18.3 test tank is removed from the test structure. (ViX, Blobifie)
- The “can crusher” cap is removed from the B18.1 test tank. (ViX, Blobifie)
- Production site: B22’s methane header tank and its A6:4 section enter Megabay 1, and S42 is lowered over the transfer tubes/jig for integration. (ViX)
- S41 in Megabay 2. (cnunez)
- Flight 13 launch attempt: (NSF full livestream)
- Detonation suppression system is tested, B20 grid fins are tested. (ViX, NSF)
- Range support helicopters are on duty. (ViX, Priel)
- Chopsticks move to launch position. (ViX, TrackingTheSB)
- Road closure is removed. (NSF)
- Scrub due to weather, 24-hour recycle. (SpaceX)
- Road is opened, booster transport stand moves back away from the gateway entrance. (ViX 1, ViX 2)
- Chopsticks descend to ship position. (ViX)
- Road delay for “Pad to Production” is posted for Jul 23rd 23:59 to Jul 24th 04:00, likely for the booster and ship transport stands. (starbase.texas.gov, archive, ViX 1, ViX 2)
- Beach closures are now scheduled for Jul 24th and 25th, both 12:00 to 21:00. (starbase.texas.gov, archive, ViX, Golden)
- McGregor: R3.78 (removed from B20 E16 position) returns to the testing area. (SpaceRhin0)
- Florida: LC-39A chopsticks are tested. (Bergeron)
- Schematic of a Starship breakover frame recently seen in Florida. (Killip)


